Health and Safety legislation is paramount to our employees – we want each employee to carry out each task safely whilst delivering the project.
Taranis Engineering has appointed a Director for the management and execution of all its Health and Safety policies, quality assured and maintained which runs alongside the key deliverables of each project.
Health and Safety legislation encompasses all areas of the workplace and is given the highest priority at Taranis Engineering.
Taranis Engineering were approached by 21st Century Building Services for the first time to tender for the Cat A works. We were successful and this quickly turned into the full design and build works for a tenant who wanted to move into the building immediately. We provided a full mechanical installation comprising of multiple Air Conditioning Systems, new Air Handling Units, and a reformatting of the water services across the property.
Taranis Engineering worked alongside Lancer Scott to develop the design of M&E systems to be installed within the Bridge House project refurbishment. The project had existing tenants that remained in place throughout the project and a number of specific requirements due to the building's city centre location. Within our design, we also aimed to achieve very good BREEAM credits to ensure the consultants' and clients’ requirements were achieved in good time.
Taranis Engineering is able to provide a full design and installation service for your environmental control needs.